Validate Gate Config form

Configuration Gate Gate Configurations Gate Configurations view Actions Validate Gate Configuration Validate Gate Config form

The Validate Gate Config form validates the selected gate configuration.

This feature is a work in progress and therefore cannot validate all mistakes in the selected gate configuration.

Prerequisites

To validate a gate configuration, N4 checks for:

For example, if you include the RejectCarrierVisitPastCutoff (on page 1) business task for a gate transaction type, you must also include the mandatory fields Hazards - Add/Edit and Hazard Checked in the gate form for the gate transaction type.

For example, if you include the ApplyInspectionDamages (on page 1) business task, you must also include the WaitForContainerInspection (on page 1), ApplyContainerDamages (on page 1), and ApplyCtrAccessoryDamages (on page 1) business tasks for the gate transaction type.

To validate the gate configuration:

  1. In the left pane, select the gate configuration that you want to validate.

  1. Select Actions Validate Gate Configuration.

  2. Select one of the check boxes displayed in the form to enable the Save button.

The check boxes in the Validate Gate Config form are not used in the code and will be removed from the interface in a future release.

  1. Click Save.

N4 validates the gate configuration and displays any configuration errors that need to be resolved in the Application Error form. To close the Application Error form, click OK. If no errors are found, N4 closes the Validate Gate Config form.